48 Edgecroft Road

Thursday, June 30, 2016

TED Welds

Ted, the welder I usually see two or three times a year, was in to weld all of the structural steel joints together and attach straps to all of the columns.  We are now ready for the big three to start their rough-ins - HVAC, plumbing and electrical.  The first two start Monday!



Posted by TPM Custom Homes at 2:14 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Electrical, Framing, Site Planning

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

TPM Custom Homes
View my complete profile

Blog Archive

  • ►  2017 (1)
    • ►  January (1)
  • ▼  2016 (134)
    • ►  December (10)
    • ►  November (11)
    • ►  October (22)
    • ►  September (14)
    • ►  August (14)
    • ►  July (24)
    • ▼  June (21)
      • TED Welds
      • Concrete work
      • Forming Day
      • Concrete in the basement... it's a wrap!
      • Pour cancelled
      • Concrete Prep, Roof Done
      • Roof starts
      • Framing the Roof
      • Inside drains passed, roof work continues
      • Truss assembly begins
      • Basement drains
      • Sewer and Water Upgrade
      • Roof trusses arrive
      • Blocking up the wall
      • Steel posts installed
      • 2nd floor complete
      • 2nd Floor Walls Start
      • Prep for 2nd Floor
      • First Floor Walls
      • First Floor Complete
      • Framing Begins
    • ►  May (15)
    • ►  April (1)
    • ►  March (1)
    • ►  February (1)
Simple theme. Theme images by hidesy. Powered by Blogger.