Wednesday, June 29, 2016

Concrete work

The team from BHM was in again today to do the garage, porch and back walkout stairs.  It was a lot of heavy lifting, but luckily the weather has cooled down a bit.







Posted by TPM Custom Homes at 10:49 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Concrete

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

TPM Custom Homes
View my complete profile

Blog Archive

  • ►  2017 (1)
    • ►  January (1)
  • ▼  2016 (134)
    • ►  December (10)
    • ►  November (11)
    • ►  October (22)
    • ►  September (14)
    • ►  August (14)
    • ►  July (24)
    • ▼  June (21)
      • TED Welds
      • Concrete work
      • Forming Day
      • Concrete in the basement... it's a wrap!
      • Pour cancelled
      • Concrete Prep, Roof Done
      • Roof starts
      • Framing the Roof
      • Inside drains passed, roof work continues
      • Truss assembly begins
      • Basement drains
      • Sewer and Water Upgrade
      • Roof trusses arrive
      • Blocking up the wall
      • Steel posts installed
      • 2nd floor complete
      • 2nd Floor Walls Start
      • Prep for 2nd Floor
      • First Floor Walls
      • First Floor Complete
      • Framing Begins
    • ►  May (15)
    • ►  April (1)
    • ►  March (1)
    • ►  February (1)
Simple theme. Theme images by hidesy. Powered by Blogger.