48 Edgecroft Road

Wednesday, June 8, 2016

2nd floor complete

The guys completed the partitions and proceeded with the odds and ends throughout the house that needed to be completed.  I did a short walkthrough that I'm sure will be dizzying and not very informative, but you can see a lot of wood framing :-)



Posted by TPM Custom Homes at 4:59 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Framing

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

TPM Custom Homes
View my complete profile

Blog Archive

  • ►  2017 (1)
    • ►  January (1)
  • ▼  2016 (134)
    • ►  December (10)
    • ►  November (11)
    • ►  October (22)
    • ►  September (14)
    • ►  August (14)
    • ►  July (24)
    • ▼  June (21)
      • TED Welds
      • Concrete work
      • Forming Day
      • Concrete in the basement... it's a wrap!
      • Pour cancelled
      • Concrete Prep, Roof Done
      • Roof starts
      • Framing the Roof
      • Inside drains passed, roof work continues
      • Truss assembly begins
      • Basement drains
      • Sewer and Water Upgrade
      • Roof trusses arrive
      • Blocking up the wall
      • Steel posts installed
      • 2nd floor complete
      • 2nd Floor Walls Start
      • Prep for 2nd Floor
      • First Floor Walls
      • First Floor Complete
      • Framing Begins
    • ►  May (15)
    • ►  April (1)
    • ►  March (1)
    • ►  February (1)
Simple theme. Theme images by hidesy. Powered by Blogger.