48 Edgecroft Road

Thursday, June 16, 2016

Basement drains

Tony was in to start the basement drains today.  We're roughing in a secondary kitchen and laundry unit, so the work is pretty extensive as far as basement drains go.  We are on target to have the concrete slab in the basement poured next week.


Posted by TPM Custom Homes at 11:45 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Plumbing

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

TPM Custom Homes
View my complete profile

Blog Archive

  • ►  2017 (1)
    • ►  January (1)
  • ▼  2016 (134)
    • ►  December (10)
    • ►  November (11)
    • ►  October (22)
    • ►  September (14)
    • ►  August (14)
    • ►  July (24)
    • ▼  June (21)
      • TED Welds
      • Concrete work
      • Forming Day
      • Concrete in the basement... it's a wrap!
      • Pour cancelled
      • Concrete Prep, Roof Done
      • Roof starts
      • Framing the Roof
      • Inside drains passed, roof work continues
      • Truss assembly begins
      • Basement drains
      • Sewer and Water Upgrade
      • Roof trusses arrive
      • Blocking up the wall
      • Steel posts installed
      • 2nd floor complete
      • 2nd Floor Walls Start
      • Prep for 2nd Floor
      • First Floor Walls
      • First Floor Complete
      • Framing Begins
    • ►  May (15)
    • ►  April (1)
    • ►  March (1)
    • ►  February (1)
Simple theme. Theme images by hidesy. Powered by Blogger.