Miguel finished the finicky truss work early and was able to do the front gables and sheeting by the end of the day. Finally, we see (sans porch) what the front will look like, and I'm happy with it!
Tuesday, June 21, 2016
Monday, June 20, 2016
Inside drains passed, roof work continues
A productive day onsite again... Tony was onsite when Mohamed came to test the basement drains for code and slope. Pass!
Miguel, still working through a stomach flu, was baking in the sun on the top of the trusses all day. The sheeting should start late in the day so Virgilio can start either tomorrow afternoon or Wednesday morning. Nice!
Miguel, still working through a stomach flu, was baking in the sun on the top of the trusses all day. The sheeting should start late in the day so Virgilio can start either tomorrow afternoon or Wednesday morning. Nice!
Friday, June 17, 2016
Truss assembly begins
Miguel was in today, working through bad stomach flu, to assemble and brace the truss system. If all goes well, we can get the shingles started on Monday or Tuesday.
Thursday, June 16, 2016
Basement drains
Tony was in to start the basement drains today. We're roughing in a secondary kitchen and laundry unit, so the work is pretty extensive as far as basement drains go. We are on target to have the concrete slab in the basement poured next week.
Wednesday, June 15, 2016
Sewer and Water Upgrade
The City contractor, Co X Co, was in today upgrading the sewer main and water service line to 1". This is one of the mandatory service requirements for a new build, and one in my opinion, that most people should do even in a major renovation. The old style drains were pretty bad, and the default 1/2" water line does not have sufficent water pressure by today's standards.
It was a messy job today - with the ground water being so high in the neighbourhood, the guys had a hard time. We had some neighbour unrest as well, which is never an easy situation, but I smoothed it over as best I could (so far my plumber has visited her twice and I have had guys attending to various small requests in order to keep her happy). Building is a very disruptive thing, so I'm making the best effort possible to keep things neat and orderly - but it's still construction.
Monday, June 13, 2016
Roof trusses arrive
The trusses arrived on schedule this morning and Miguel grabbed them and deftly maneuvered the zoom boom machine to drop them on top of the house. We should have the roof on and sheeted tomorrow.
Friday, June 10, 2016
Blocking up the wall
We were able to sneak Tom's guys in today to bring the rear, half brick wall that is hidden by the roof, right up just above the roof level with 4" block. It was much easier to do it now, before the roof was sheeted... at that point, you either have a mason ripping off carpentry work to get access, or a very unhappy mason... and I don't want either.