JSC Contracting arrived to start the trim and doors today.  We've gone with a back-band on top of 3.5" beveled casing, and a 7 1/4" one step beveled baseboard.  So far, so good!



Freddy was in today to finish off the master and basement tiled areas, installing the Caesar stone shower jambs in the master and finally, grouting all of the tiled surfaces.  He may have a few touch ups tomorrow and then he's done until we have the kitchen in.