Wednesday, October 19, 2016

Paint, carpentry and railing frame

Mick continued paint prep and exterior paint outside while Juvee worked away at the trim elements on the first floor.


Meanwhile, Art Metal arrived to assemble (then take down!) the metal frame for the glass railing.  Their process is to fully assemble the railing pieces onsite, then take it back to their shop for factory finishing and reassemble when they come back with the glass.  It makes for a perfect install every time.


No comments:

Post a Comment