Wednesday, October 12, 2016

Tile complete, trim started!

JSC Contracting arrived to start the trim and doors today.  We've gone with a back-band on top of 3.5" beveled casing, and a 7 1/4" one step beveled baseboard.  So far, so good!



Freddy was in today to finish off the master and basement tiled areas, installing the Caesar stone shower jambs in the master and finally, grouting all of the tiled surfaces.  He may have a few touch ups tomorrow and then he's done until we have the kitchen in.




Monday, October 10, 2016

Tile accent

We've opted for three blue accent strips in the kids bathroom which look kind of cool.  Fred was in today, working late into the night, to get ahead of the tiling job.


Tuesday, October 4, 2016

Freddy slips in at night

My tile setter, Freddy, is awesome.  He has a real sense for schedule and never wants to disrupt the other trades.  Well, while the flooring continued downstairs, nobody saw Freddy sneak in and finish all of the tiled floors on the second floor.  Very stealthy Fred!




Tuesday, September 27, 2016

Drypack and Video

Today is the day where we start "finishing" the house.  The drywall is done, and the house is primed... well - check it out.



Also, the drypackers were in to prepare the wood surfaces to better accept tile.  That includes the master shower which got a sculpted slope down to the drain.