Ted, the welder I usually see two or three times a year, was in to weld all of the structural steel joints together and attach straps to all of the columns. We are now ready for the big three to start their rough-ins - HVAC, plumbing and electrical. The first two start Monday!
Thursday, June 30, 2016
Wednesday, June 29, 2016
Concrete work
The team from BHM was in again today to do the garage, porch and back walkout stairs. It was a lot of heavy lifting, but luckily the weather has cooled down a bit.
Tuesday, June 28, 2016
Forming Day
BHM was in again today working on the forming for tomorrow's pour of the walkout steps, front porch and steps, and garage. It takes quite a bit of work and a fine attention to detail for this kind of work (ie you don't want to mess this up!) - that's why I rely on Tom for this work.
Monday, June 27, 2016
Concrete in the basement... it's a wrap!
Tom's entire team was hard at work this morning, bombing the concrete into the basement and spreading it out. It's a tough job, but much better than laying brick on a sunny scaffold!
Meanwhile, Junior and his team were in to install the housewrap on the house. With the masonry still about four weeks away, it's always good to have a professional wrap the house and make it as tight as possible for any weather that might blow our way. Once the windows are in, we'll be pretty water tight.
Meanwhile, Junior and his team were in to install the housewrap on the house. With the masonry still about four weeks away, it's always good to have a professional wrap the house and make it as tight as possible for any weather that might blow our way. Once the windows are in, we'll be pretty water tight.
In the afternoon, Tom and his brother worked on forming the porch and back walkout stairs, while the concrete dried enough to begin the "helicoptering" process (basically, smoothing!).
Friday, June 24, 2016
Pour cancelled
Unfortunately, Tom found out that their concrete supplier, a big local company, was shut down by Ministry of Labour late last night and we weren't able to get a substitute company in this morning. We've had to delay the concrete pour, and Tom and countless other crews around the city will be sitting twiddling their thumbs... too bad.
Thursday, June 23, 2016
Concrete Prep, Roof Done
While Virgilio's crew finished the roof, the boys from BHM were in all day prepping the basement and garage slab for the pour tomorrow. I always love the care and attention that Tom and his crew take to doing a proper job with the slab - proper wire mesh placement, a good amount of gravel for drainage, vapour barrier and flashing, as well as using the laser to set up a perfect level line throughout the basement.
Wednesday, June 22, 2016
Roof starts
The roofers started today (Miguel was nice enough to lift all of the materials onto the roof, which saved a bunch of time for Virgillio and his team!). I don't expect them to finish, because, you guessed it - it's Euro Cup time and the Portuguese team is up against the wall. Tomorrow, we'll have the rest of our roof in place!