The City was in today for the scheduled plumbing rough in. This involves checking that the water lines can handle 100 psi of compressed air without a leak for an extended time (we've had the loaded for a week, so we're good to go!) as well as filling up the drains and vents to the roof to show that they are also water tight. Then, we go through each plumbing zone, making sure that everything is to code, properly vented and that the ABS pipes are not going through framing they shouldn't. Of course, with some plumbers, an inspection can be very stressful.... but not with Tony. Passed!
Meanwhile, BHM is cooking along - in both ways. The weather has been incredible, though quite hot on the sunny side of the house. They have finished the 2nd third of the side, and are looking to finish the top of the wall tomorrow. I have to say, the neighbour on this side of the house is one of the nicest guys I've worked next to!